|
Acetylferrocene 25 mM in C6H6, 1x1000us, Ag(111) Uploaded by jpetersen Created: June 25, 2019 Updated: June 25, 2019 |
|
Cracker Scope, RT vapor deposited 8thiol-OH, 10 mM in ACN, on Au(111), short tip carrier with a long tip, quatrafoil nut fully tightened, water on, beam = -1.1kV, 14 minute H exposure Uploaded by dturner Created: June 26, 2019 Updated: June 26, 2019 |
|
Cracker Scope, 20 day RT vapor deposited 8thiol-OH, 10 mM in ACN, on Au(111), short tip carrier with a long tip, quatrafoil nut fully tightened Uploaded by dturner Created: June 28, 2019 Updated: June 28, 2019 |
|
6-methylisatin pulse deposited on Au(111)#2, 10mM in ACN, 2x1000us Uploaded by asilski Created: July 1, 2019 Updated: July 1, 2019 |
|
Cracker Scope, 20 day RT vapor deposited 8thiol-OH, 10 mM in ACN, on Au(111), short tip carrier with a long tip, quatrafoil nut fully tightened Uploaded by dturner Created: July 2, 2019 Updated: July 2, 2019 |
|
6-methylisatin pulse deposited on Au(111), 10mM ACN Uploaded by asilski Created: July 2, 2019 Updated: July 2, 2019 |
|
6-methylisatin pulse deposited on Au(111)#2, 10mM in ACN, 2x1000us Uploaded by asilski Created: July 3, 2019 Updated: July 3, 2019 |
|
6-methylisatin pulse deposited on Au(111)#2, followed by 45C 20 min anneal Uploaded by asilski Created: July 5, 2019 Updated: July 5, 2019 |
|
Ag(111) Clean check Uploaded by jpetersen Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
Uploaded by jpetersen Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
5-methylisatin vapor deposited on Au(111)#3, 40C 1 min Uploaded by asilski Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
Acetylferrocene, 100 mM, C6H6, 1x1000us, Ag(111) Uploaded by jpetersen Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
5-methylisatin vapor deposited on Au(111)#3, 40C 1 min dose Uploaded by jpetersen Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
5-methylisatin vapor deposited on Au(111)#3, 40C 1 min dose Uploaded by jpetersen Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 36 day RT vapor deposition 8-thiolOH on Au(111)/Mica, RT, UHV Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 36 day RT vapor deposition 8-thiolOH on Au(111)/Mica, RT, UHV Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 41 day RT vapor deposition 8-thiolOH on Au(111)/Mica, RT, UHV Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 41 day RT vapor deposition 8-thiolOH on Au(111)/Mica, RT, UHV, water on, beam = -1.1 kV, 10 second H exposure Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 41 day RT vapor deposition 8-thiolOH on Au(111)/Mica, vented once, RT, UHV, water on, beam = -1.1 kV, 10 sec H exposure Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |
|
LT Scope 6 day RT vapor deposition 8-thiolOH on Au(111)/Mica, RT, UHV, water on, beam = -1.1 kV, 10 second H exposure Uploaded by dturner Created: Sept. 9, 2019 Updated: Sept. 9, 2019 |