Uploaded by cschalk Cracker Scope, DTC4 on Au(111), 3 hour vapor deposited in 65C oven, 1mM in ACN
Uploaded by cschalk
Created: Nov. 12, 2019
Updated: Nov. 12, 2019
Uploaded by jpetersen Ferrocenecarboxaldehyde, 20 mM, C6H6, 1x1000us, Au(111)/Mica#3
Uploaded by jpetersen
Created: Nov. 12, 2019
Updated: Nov. 12, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 3 hour vapor deposited in 65C oven, 1mM in ACN, water on, beam = -1.1 kV, no H exposure
Uploaded by dturner
Created: Nov. 13, 2019
Updated: Nov. 13, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN, water on, beam = -1.1 kV, 50 sec H exposure
Uploaded by dturner
Created: Nov. 13, 2019
Updated: Nov. 13, 2019
Uploaded by cschalk Cracker Scope, DTC4 on Au(111), 15 hour vapor deposited 65C oven, 1mM in ACN, water on, beam = -1.1 kV, 35 sec H exposure
Uploaded by cschalk
Created: Nov. 14, 2019
Updated: Nov. 14, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 42 hour vapor deposited RT, 1mM in ACN, water on, beam = -1.1 kV, 5 sec H exposure
Uploaded by dturner
Created: Nov. 15, 2019
Updated: Nov. 15, 2019
Uploaded by asilski L-proline pulse deposited on Au(111), 10mM in methanol
Uploaded by asilski
Created: Nov. 19, 2019
Updated: Nov. 19, 2019
Uploaded by asilski L-proline pulse deposited on Au(111)#3, 10mM in MeOH
Uploaded by asilski
Created: Nov. 20, 2019
Updated: Nov. 20, 2019
Uploaded by asilski L-proline pulse deposited on Au(111)#2, 10mM in MeOH, RT anneal 2 days
Uploaded by asilski
Created: Nov. 21, 2019
Updated: Nov. 21, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN
Uploaded by dturner
Created: Nov. 22, 2019
Updated: Nov. 22, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN, water off, electronics off, H leak off
Uploaded by dturner
Created: Nov. 22, 2019
Updated: Nov. 22, 2019
Uploaded by asilski 1:1 D/L-proline pulse deposited on Au(111) in 5mM in MeOH
Uploaded by asilski
Created: Nov. 24, 2019
Updated: Nov. 24, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN, water on
Uploaded by dturner
Created: Nov. 25, 2019
Updated: Nov. 25, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN, water on with extra flow, beam = -1.1 kV, 15 second H exposure
Uploaded by dturner
Created: Dec. 2, 2019
Updated: Dec. 2, 2019
Uploaded by jpetersen Ferrocene, 20 mM, C6H6, 1x1000us, Au(111)/mica#3
Uploaded by jpetersen
Created: Dec. 2, 2019
Updated: Dec. 2, 2019
Uploaded by asilski S-indoline-2-carboxylic acid vapor deposited on Au(111)#2, 40C 1 min
Uploaded by asilski
Created: Dec. 3, 2019
Updated: Dec. 3, 2019
Uploaded by asilski Au(111)#2, clean check
Uploaded by asilski
Created: Dec. 3, 2019
Updated: Dec. 3, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 48 hour vapor deposited RT, 1mM in ACN, water on with extra flow, beam = -1.1 kV, no H exposure
Uploaded by dturner
Created: Dec. 3, 2019
Updated: Dec. 3, 2019
Uploaded by dturner Cracker Scope, DTC4 on Au(111), 18 hour vapor deposited 65C, 1mM in ACN, electronics, water, and leak off, 5 second H exposure
Uploaded by dturner
Created: Dec. 4, 2019
Updated: Dec. 4, 2019
Uploaded by asilski S-indoline-2-carboxylic acid vapor deposited on Au(111)#2, 40C 1 min
Uploaded by asilski
Created: Dec. 4, 2019
Updated: Dec. 4, 2019