Uploaded by bheiner Istain 20 mM in MeOH 1x1000 us pulse deposited on Au(100)
Uploaded by bheiner
Created: Jan. 20, 2021
Updated: Jan. 20, 2021
Uploaded by bheiner Isatin 20 mM in MeOH 1x1000 us pulse deposited on Au(100)
Uploaded by bheiner
Created: Jan. 21, 2021
Updated: Jan. 21, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 3 day sol. dep. at RT.
Uploaded by apittsford
Created: Jan. 22, 2021
Updated: Jan. 22, 2021
Uploaded by bheiner Isatin 20 mM in MeOH 1x1000 us pulse deposited on Au(100)
Uploaded by bheiner
Created: Jan. 22, 2021
Updated: Jan. 22, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 3 day sol. dep. at RT.
Uploaded by apittsford
Created: Jan. 25, 2021
Updated: Jan. 25, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 2 hr. sol. dep. at 70C.
Uploaded by apittsford
Created: Jan. 26, 2021
Updated: Jan. 26, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 24 hr. sol. dep. at RT
Uploaded by apittsford
Created: Jan. 27, 2021
Updated: Jan. 27, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 24 hr. sol. dep. at RT, water on, beam on -1.1kV, 30s H exposure
Uploaded by apittsford
Created: Jan. 28, 2021
Updated: Jan. 28, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 2 hr. sol. dep. at 70C
Uploaded by apittsford
Created: Jan. 29, 2021
Updated: Jan. 29, 2021
Uploaded by bheiner Isatin 20 mM pulse deposited 1x1000 us on Au(100)
Uploaded by bheiner
Created: Jan. 29, 2021
Updated: Jan. 29, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 20 hr. sol. dep. at RT
Uploaded by apittsford
Created: Feb. 2, 2021
Updated: Feb. 2, 2021
Uploaded by bheiner Isatin 20 mM pulse depostion 1x1000 us on Au(100)
Uploaded by bheiner
Created: Feb. 4, 2021
Updated: Feb. 4, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 2 hr. sol. dep. at 70C
Uploaded by apittsford
Created: Feb. 8, 2021
Updated: Feb. 8, 2021
Uploaded by apittsford Cracker Scope, DTC2 on Au(111)/mica 3 hr. sol. dep. at 70C
Uploaded by apittsford
Created: Feb. 11, 2021
Updated: Feb. 11, 2021
Uploaded by apittsford Cracker Scope, 1.4 mM DTC2 in EtOH on Au(111)/mica 24 hr. sol. dep. at RT
Uploaded by apittsford
Created: Feb. 12, 2021
Updated: Feb. 12, 2021
Uploaded by apittsford Cracker Scope, 1.4 mM DTC2 in EtOH on Au(111)/mica 24 hr. sol. dep. at RT, beam =-1.1 kV, water on, no H exposure
Uploaded by apittsford
Created: Feb. 15, 2021
Updated: Feb. 15, 2021
Uploaded by apittsford
Uploaded by apittsford
Created: Feb. 18, 2021
Updated: Feb. 18, 2021
Uploaded by dturner Cracker Scope, 8thiol on Au(111)/mica 4 day vap. dep. at 70C
Uploaded by dturner
Created: Feb. 23, 2021
Updated: Feb. 23, 2021
Uploaded by apittsford Cracker Scope, 8thiol on Au(111)/mica 4 day vap. dep. at 70C, beam = -1.1kV, water on, no H exposure
Uploaded by apittsford
Created: Feb. 24, 2021
Updated: Feb. 24, 2021
Uploaded by apittsford Cracker Scope, 1.4 mM DTC2 in EtOH on Au(111)/mica 3 hr. soln. dep. at 70C
Uploaded by apittsford
Created: Feb. 26, 2021
Updated: Feb. 26, 2021